Introduction to the plan:
380V AC power is converted into DC base station equipment such as BBU and AUU through power switches, including traditional distribution schemes, intelligent distribution schemes, and modular distribution schemes.
Project value points (highlights):
Comprehensive protection and management functions, safer use of electricity, and more efficient operation;
Intelligent circuit breaker with remote and timed control functions, automatically controlling the entry and exit of base station equipment according to business needs, energy-saving, and reducing waste;
The height of the 5G base station dedicated 1U switch is only 40mm, which can increase the power density of the distribution unit by 2.6 times;